Turbine Model: 6 Units of ENERCON EP3 E138 E3/ST/111 (Ongoing)
TorkCheck is managing the ongoing WEC erection operations of 6 ENERCON EP3 E138 turbines at the Ihlamur Wind Farm. Our operational philosophy, established in 2009, ensures this project progresses safely, efficiently, and fully aligns with the designated timeline.
continue reading
Related Posts
Turbine Model: 7 Units of ENERCON EP3 E138 E3/ST/111 (Ongoing)
Turbine Model: 2 Units of Aselsan 4.3 MW (Ongoing)
Turbine Model: 15 Units Total (7 Units of E138 E3/ST/111,8 Units E-138 EP3 E2/ST/96) (Ongoing)

