• Technical Details: Rated Power: 4.3 MW | Hub Height: 100 m | Tower: Tubular Steel Tower, 5 Sections

TorkCheck is managing the ongoing WEC erection operations of 2 Aselsan 4.3 MW turbines at the Aselsan Alaçatı Wind Farm. Our operational philosophy, established in 2009, ensures this specialized project progresses safely, efficiently, and fully aligns with the designated timeline.

continue reading

Related Posts